Gå til hovedindhold
Practical Schedule Risk Analysis
Kun hos Saxo DK

Practical Schedule Risk Analysis

Vi har samlet 2 aktuelle varer med samme produktnavn hos Saxo DK på én side.

Pris fra

399,95 kr

Se alle muligheder

Denne side samler varer efter forhandler og produktnavn. Det betyder ikke nødvendigvis, at varerne er officielle varianter af samme produkt.

Muligheder hos forhandleren

Vi kan ikke med sikkerhed afgøre, om varerne er varianter eller separate produkter. Sammenlign detaljerne før du går videre.

ProduktVarenr.PrisHandling
Practical Schedule Risk Analysis9781032837963399,95 krTil butik
Practical Schedule Risk Analysis9781032837963399,95 krTil butik

Produktdetaljer

Practical Schedule Risk Analysis

Practical Schedule Risk Analysis

David Hulettvirksomheder og ledelse

399,95 kr

Til butik
Varenr.:
9781032837963

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project's schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path's completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

Læs mere hos Saxo DK
Practical Schedule Risk Analysis

Practical Schedule Risk Analysis

David HulettBog

399,95 kr

Til butik
Varenr.:
9781032837963

Project scheduling is required for good project management, and the schedule represents the project plan under a specific set of assumptions, often that it will avoid new risks or even those that have occurred on previous occasions. The typical Critical Path Method (CPM) schedule assumes that the project team knows how long the scheduled activities will take. Yet, the experienced project manager knows that duration values so precisely stated are actually only estimates based on assumptions that could be wrong. A schedule risk analysis explores the implications for the project's schedule of risk to the activity durations and also identifies the most important schedule risks. This analysis, building on and extending CPM scheduling, will result in a more accurate estimate of completion and provide an early opportunity for planning effective risk mitigation actions. Practical Schedule Risk Analysis contains a complete treatment of schedule risk analysis from basic to advanced concepts. The methods are introduced at the simplest level: * Why is the duration uncertain? * And how do we represent this uncertainty with a probability distribution? These are then progressively elaborated: * How does uncertainty of activities along a path lead to more uncertainty of the path's completion date? * How can a schedule with parallel paths be riskier than each of the paths individually? * How can we represent risks about activities that are not in the schedule at all? Culminating in a discussion of the most powerful and advanced capabilities available in current commercial software. Schedule risk analysis is a process that is industry-independent, and the methods explained in this volume have been used by the author with positive effect in such industries as construction, oil and gas, information systems, environmental restoration and aerospace/defense. The result is a book that is not only highly practical; something that people within all types of projects and in all industries can apply themselves; but that is an extraordinarily complete guide to creating and managing a rigorous project schedule.

Læs mere hos Saxo DK

Oplysningerne kommer fra Saxo DKs aktuelle produktdata.